- Home
- Year Wise Tariff Orders
- 2019

| Sr. No. | Title | View | Order No. | Order Date | Gazette No. | Date of Notification |
|---|---|---|---|---|---|---|
| 1 | Proposal received from Kolkata Port Trust (KOPT) for review of rate of rent of KOPT’s land at Panskura. |
(322 KB)
|
TAMP/59/2018-KOPT | 29/03/2019 | 202 | 07/06/2019 |
| 2 | Proposal from the V.O. Chidambaranar Port Trust for revision of lease rent for the land leased out to M/s. Southern Petrochemical Industries Corporation Limited at VOC Wharf for installation of Phosphoric acid storage tanks. |
(526 KB)
|
TAMP/27/2018-VOCPT | 18/01/2019 | 74 | 21/02/2019 |
| 3 | Proposal from the V.O.Chidambaranar Port Trust for amendments to its existing Scale of Rates approved vide Order No.TAMP/82/2016-VOCPT dated 29 March 2017 relating to Schedule 2.4.2 of Berth Hire Charges for Other Vessels – Note (4). |
(1 MB)
|
TAMP/53/2018-VOCPT | 18/01/2019 | 75 | 21/02/2019 |
| 4 | Proposal from the V.O Chidambaranar Port Trust for revision of lease rent for Salt Pan for the period from 1998, 2003, 2008, 2013 & 2017 as per the direction from the Hon’ble High Court of Judicature at Madras with reference to Writ Petition No.41444 of 2002 and 25104 of 2016 and WMP No.21496 of 2016 filed by M/s.Tuticorin Salt and Marine Chemical Ltd (TSMC). |
(598 KB)
|
TAMP/70/2018-VOCPT | 18/01/2019 | 77 | 25/02/2019 |
| 5 | Proposal received from the V.O. Chidambaranar Port Trust (VOCPT) for general revision of its Scale of Rates (Notifying Revised Scale of Rates and Performance Standards) |
(671 KB)
|
TAMP/15/ 2019-VOCPT | 10/10/2019 | 363 | 22/10/2019 |
| 6 | Proposal received from V.O. Chidambaranar Port Trust (VOCPT) for fixation of lease rent for land under Coastal Employment Unit at VOCPT. |
(591 KB)
|
TAMP/29/ 2019-VOCPT | 10/10/2019 | 379 | 30/10/2019 |
| 7 | Proposal received from the V.O. Chidambaranar Port Trust (VOCPT) for general revision of its Scale of Rates (Notifying Speaking Order) |
(2 MB)
|
TAMP/15/ 2019-VOCPT | 10/10/2019 | 440 | 02/12/2019 |
| 8 | Corrigendum to the Order No.TAMP/15/2019-VOCPT dated 10 October 2019 notifying Scale of Rates on 22 October 2019 vide Gazette No.363 in the Gazette of India, disposing of the proposal received from the V.O. Chidambaranar Port Trust (VOCPT) for General Revision of its Scale of Rates. |
(37 KB)
|
TAMP/15/ 2019-VOCPT | 29/11/2019 | 457 | 11/12/2019 |
| 9 | This case relates to the Proposal received from Kolkata Port Trust for extension of performance as well as Penalty or Incentive norms for handling Edible Oil through pipeline at Haldia Dock Complex. |
(191 KB)
|
TAMP/66/2018-KOPT | 18/01/2019 | 61 | 12/02/2019 |
| 10 | Proposal received from Kolkata Port Trust (KOPT) for introducing Benchmark Pumping rate for simultaneous discharge of Butane and Propane and introducing incentive norms and revision of penalty norms against Benchmark Pumping rate for all Liquid Cargoes handled at Haldia Oil Jetties (excepting Edible Oil). |
(307 KB)
|
TAMP/67/2018-KOPT | 18/01/2019 | 59 | 12/02/2019 |
| 11 | Proposal received from Kolkata Port Trust (KOPT) for fixation of rate for Pre-gate cum Parking Facility at Coal Dock Road and other similar facilities at Kolkata Dock System at KOPT. |
(273 KB)
|
TAMP/74/2018-KOPT | 29/03/2019 | 203 | 07/06/2019 |
| 12 | Extension of the Validity of the rate structure for Gandhidham Township Land of Deendayal Port Trust (DPT). |
(19 KB)
|
TAMP/20/2010-KPT | 29/11/2019 | 458 | 11/12/2019 |
| 13 | Proposal received from Kolkata Port Trust for fixation of reference tariff for the project “Mechanization of Berth No. 3 on Design, Build, Finance, Operate, and Transfer (“DBFOT”) basis” for the period of thirty years at Haldia Dock complex (HDC). |
(1 MB)
|
TAMP/41/2018-KOPT | 29/03/2019 | 200 | 07/06/2019 |
| 14 | Proposal received from Kolkata Port Trust for fixation of tariff to be realized from the users of the Floating barge jetty at Haldia Dock Complex. |
(419 KB)
|
TAMP/68/2018-KOPT | 14/06/2019 | 247 | 11/07/2019 |
| 15 | Proposal received from Kolkata Port Trust for fixation of upfront tariff for stevedoring operation for anchorage discharge and barge handling at Haldia Dock Complex (HDC). |
(527 KB)
|
TAMP/8/2019-KOPT | 14/06/2019 | 246 | 11/07/2019 |
| 16 | Proposal received from Kolkata Port Trust (KOPT) to re-notify the lease rent for the various Buildings of KOPT at Kolkata. |
(416 KB)
|
TAMP/62/2016-KOPT | 10/10/2019 | 382 | 30/10/2019 |
| 17 | Proposal received from Kolkata Port Trust (KOPT) for setting up of a floating crane at Diamond Harbour and other deep water anchorages within the limits of KOPT for lighterage / topping of Cargo including containers for a period of 15 years. |
(397 KB)
|
TAMP/22/2019-KOPT | 29/11/2019 | 467 | 17/12/2019 |
| 18 | Proposal received from Kolkata Port Trust for realization of Penal Berth Hire Charges from vessels remaining inside Dock after completion of work for long period. |
(381 KB)
|
TAMP/45/2019-KOPT | 29/11/2019 | 463 | 17/12/2019 |
| 19 | Direction of the Hon’ble High court of Calcutta in the Writ Petition no. 15451 (W) of 2017 filed M/s. TIL Limited (TILL) challenging the tariff Order no. TAMP/62/2016-KOPT dated 29 March 2017 passed by the Authority, in the Hon’ble High Court of Calcutta. |
(662 KB)
|
TAMP/53/2017-KOPT | 29/11/2019 | 39 | 24/01/2020 |
| 20 | Extension of validity of the existing Scale of Rates (SOR) of the TM International Logistics Limited. |
(36 KB)
|
TAMP/8/2016-TMILL | 26/02/2019 | 87 | 06/03/2019 |
| 21 | Proposal from TM International Logistics Limited for general revision of its Scale of Rates. |
(281 KB)
|
TAMP/7/2019-TMILL | 29/03/2019 | 201 | 07/06/2019 |
| 22 | Extension of the validity of the existing tariff for 100 Ton capacityHarbour Mobile Crane (HMC) installed by private operators atParadip Port Trust. |
(12 KB)
|
TAMP/30/2014- PPT | 25/02/2019 | 88 | 06/03/2019 |
| 23 | Proposal received from the Seaport Shipping Pvt. Ltd. (SSPL) for notification of its Scale of Rates for Design, Supply, Installation, Testing, Commissioning and Maintenance of Mobile Rubber Tyred electrically operated hoppers for a period of 10 years on revenue share basis. |
(443 KB)
|
TAMP/25/ 2019-VOCPT | 10/10/2019 | 381 | 30/10/2019 |
| 24 | Proposal received from Delhi-Mumbai Industrial Corridor Development Corporation (DMICDC) for levy of Mandatory User Charges (MUC) of DMICDC’s Logistics Data Bank (LDB) project |
(1 MB)
|
TAMP/12/2019-MUC | 24/07/2019 | 297 | 21/08/2019 |
| 25 | Corrigendum to the Order No. TAMP/79/2018-Misc. dated 18 January 2019 relating to the Working Guidelines to be issued by the Authority to operationalise the Tariff Policy for Major Port Trusts issued by the Ministry of Shipping (MOS) called “Tariff Policy for Major Port Trusts, 2018”. |
(277 KB)
|
TAMP/79/2018-Misc. | 29/03/2019 | 204 | 07/06/2019 |
| 26 | Proposal received from Delhi-Mumbai Industrial Corridor Development Corporation (DMICDC) for renewal of Mandatory User Charges (MUC) of DMICDC’s Logistics Data Bank (LDB) project |
(252 KB)
|
TAMP/46/2018-MUC | 25/02/2019 | 91 | 07/03/2019 |
| 27 | Proposal received from the Visakhapatnam Port Trust (VPT) for fixation of tariff for Operation of Mobile X-Ray Container Scanning System at VPT. |
(395 KB)
|
TAMP/77/2018-VPT | 29/03/2019 | 199 | 07/06/2019 |
| 28 | Proposal received from the Visakhapatnam Port Trust (VPT) for extension of the validity of the existing tariff for use of 100 tonne Harbour Mobile Crane approved by this Authority vide Order No.TAMP/21/2015-VPT dated 15 March 2015 at West Quay - 7 and 8 berth in the inner harbour for cargo handling operations by authorised service provider on license basis at VPT. |
(113 KB)
|
TAMP/70/2017-VPT | 29/03/2019 | 198 | 07/06/2019 |
| 29 | Proposal received from Visakhapatnam Port Trust for amendment in the storage schedule approved by the Authority vide Order No.TAMP/36/2014-VPT dated 2 January 2015 notifying Scale of Rates in the name of Adani Vizag Coal Terminal Pvt. Ltd. for mechanised handling of steam coal at East Quay-1 berth at inner harbor on DBFOT basis. |
(272 KB)
|
TAMP/14/2019-VPT | 24/07/2019 | 295 | 21/08/2019 |
| 30 | Proposal received from Visakhapatnam Port Trust (VPT) for amendment in the Storage schedule approved by the Authority vide Order No.TAMP/58/2008-VPT dated 11 January 2013 notifying Scale of Rates (SOR) in the name of Vizag General Cargo Berth Pvt. Ltd. (VGCBPL) for mechanized handling of coking coal and steam coal at General Cargo Berth of VPT on DBFOT basis in pursuance of the Ministry of Shipping letter No.PD-13/1/2018-PPP Cell dated 11 July 2018 of Stressed PPP Projects. |
(362 KB)
|
TAMP/9/2019-VPT | 24/07/2019 | 296 | 21/08/2019 |
| 31 | Proposal from the Visakhapatnam Port Trust for fixation of tariff for movement and handling of coal by Rail-cum-Sea route from the various collieries of MCL/lb Valley through the load port of Visakhapatnam to TANGEDCO directly. |
(243 KB)
|
TAMP/24/2019-VPT | 10/10/2019 | 374 | 30/10/2019 |
| 32 | Proposal from the Visakhapatnam Port Trust for general revision of its Scale of Rates – Notifying SOR and Performance Standards. |
(550 KB)
|
TAMP/20/2019-VPT | 29/11/2019 | 494 | 27/12/2019 |
| 33 | Proposal from the Visakhapatnam Port Trust for general revision of its Scale of Rates – Notifying Speaking Order. |
(1 MB)
|
TAMP/20/2019-VPT | 29/11/2019 | 20 | 14/01/2020 |
| 34 | Proposal received from Paradip Port Trust for revision of tariff for 100 Ton capacity Harbour Mobile Crane (HMC). |
(706 KB)
|
TAMP/ 75/2018- PPT | 14/06/2019 | 248 | 11/07/2019 |
| 35 | Reference received from Adani Kandla Bulk Terminal Pvt. Ltd. (AKBTPL) as regards amendment in TAMP Order no.TAMP/42/2009-KPT dated 17 August 2010 and Order no.TAMP/59/2014-KPT dated 02 January 2015. |
(158 KB)
|
TAMP/59/2014-KPT | 18/01/2019 | 48 | 05/02/2019 |
| 36 | Extension of the Validity of the rate structure for Gandhidham Township Land of Deendayal Port Trust (DPT). |
(18 KB)
|
TAMP/20/2010-KPT | 18/01/2019 | 56 | 08/02/2019 |
| 37 | Proposal received from Deendayal Port Trust (DPT) seeking approval of tariff for automated bagging and rake loading of fertilizers at godown no.34 inside cargo jetty area of DPT. |
(590 KB)
|
TAMP/33/2018-DPT | 18/01/2019 | 71 | 18/01/2019 |
| 38 | Extension of the Validity of the validity of the existing rate structure of Kandla land of Deendayal Port Trust (DPT). |
(78 KB)
|
TAMP/24/2014-KPT | 29/03/2019 | 208 | 12/06/2019 |
| 39 | Extension of the Validity of the rate structure for Gandhidham Township Land of Deendayal Port Trust (DPT). |
(19 KB)
|
TAMP/20/2010-KPT | 03/05/2019 | 209 | 12/06/2019 |
| 40 | Proposal received from Deendayal Port Trust for approving a separate tariff for Tuna Port as Schedule V of the existing Scale of Rates (SOR) of Deendayal Port Trust (DPT). |
(583 KB)
|
TAMP/20/2018-DPT | 14/06/2019 | 250 | 17/07/2019 |
| 41 | Extension of the Validity of rate structure of Kandla lands for categories ‘A to G’ of Deendayal Port Trust (DPT). |
(78 KB)
|
TAMP/24/2014-KPT | 10/10/2019 | 362 | 22/10/2019 |
| 42 | Proposal from the Deendayal Port Trust for general revision of its Scale of Rates.(Notifying Revised Scale of Rates and Performance Standards.) |
(462 KB)
|
TAMP/28/2019-DPT | 10/10/2019 | 377 | 30/10/2019 |
| 43 | Proposal received from the Deendayal Port Trust for general revision of its Scale of Rates. (Notifying Detailed Speaking Order) |
(2 MB)
|
TAMP/28/ 2019-DPT | 10/10/2019 | 441 | 02/12/2019 |
| 44 | Proposal from Cochin Port Trust seeking approval for extension of Performance norms based Incentive and Penalty Scheme approved by the Authority vide Order No. TAMP/75/2016-COPT dated 29 March 2017 alongwith approval for the revised Performance Norms based Incentive and Penalty Scheme for cargo operations. |
(532 KB)
|
TAMP/48/2018-COPT | 18/01/2019 | 60 | 12/02/2019 |
| 45 | Proposal received from Mumbai Port Trust (MBPT) for fixation of license fee for allotment of water area for setting up a Floating Storage Regasification Unit (FSRU) in Mumbai Harbour at Mumbai Port Trust. |
(462 KB)
|
TAMP/27/2019- MBPT | 10/10/2019 | 375 | 30/10/2019 |
| 46 | Proposal received from the Mormugao Port Trust for general revision of its Scale of Rates. |
(521 KB)
|
TAMP/11/2019- MOPT | 14/06/2019 | 245 | 11/07/2019 |
| 47 | Proposal received from the Mormugao Port Trust for general revision of its Scale of Rates (Notifying detailed Order). |
(2 MB)
|
TAMP/11/2019-MOPT | 14/06/2019 | 292 | 21/08/2019 |
| 48 | Proposal received from the South West Port Limited (SWPL) for revision of its Scale of Rates for Berth 5A and 6A in the Mormugao Port Trust under the Tariff Guidelines 2019. |
(1 MB)
|
TAMP/38/2019- SWPL | 29/11/2019 | 499 | 30/12/2019 |
| 49 | Extension of the validity of the existing Scale of Rates of the Bharat Petroleum Corporation Limited (BPCL) in the Jawaharlal Nehru Port Trust. |
(36 KB)
|
TAMP/46/2016-BPCL | 25/02/2019 | 86 | 06/03/2019 |
| 50 | Extension of the validity of the existing Scale of Rates of the Bharat Petroleum Corporation Limited (BPCL) in the Jawaharlal Nehru Port Trust. |
(36 KB)
|
TAMP/46/2016-BPCL | 14/06/2019 | 243 | 11/07/2019 |
| 51 | Extension of the validity of the existing Scale of Rates of the Bharat Petroleum Corporation Limited (BPCL) in the Jawaharlal Nehru Port Trust. |
(36 KB)
|
TAMP/46/2016-BPCL | 10/10/2019 | 365 | 24/10/2019 |
| 52 | Extension of the validity of the existing Scale of Rates of the Bharat Petroleum Corporation Limited (BPCL) in the Jawaharlal Nehru Port Trust. |
(29 KB)
|
TAMP/46/2016-BPCL | 26/12/2019 | 19 | 14/01/2020 |
| 53 | Proposal from the Jawaharlal Nehru Port Trust (JNPT) for reduction in free period for ICD Containers to 3 days. |
(753 KB)
|
TAMP/25/2018-JNPT | 10/10/2019 | 392 | 07/11/2019 |
| 54 | Extension of the validity of the existing Scale of Rates of the India Gateway Terminal Private Limited (IGTPL) in the Cochin Port Trust (COPT) |
(33 KB)
|
TAMP/81/2015-IGTPL | 03/05/2019 | 191 | 07/06/2019 |
| 55 | Proposal received from Mumbai Port Trust for fixation of lease rent for allotment of land area alongwith ‘M’ shed for retrofitting, operation and maintenance of M- shed at Prince’s dock, Mumbai Port. |
(521 KB)
|
TAMP/35/2019- MBPT | 10/10/2019 | 383 | 30/10/2019 |
| 56 | Corrigendum to Order No.TAMP/48/2018-COPT dated 18 January 2019 notified on 12 February 2019 vide Gazette No.60 approving Performance norms based Incentive and Penalty Scheme for cargo operating at Cochin Port Trust (COPT). |
(8 KB)
|
TAMP/48/2018-COPT | 29/03/2019 | 196 | 07/06/2019 |
| 57 | Proposal from the Cochin Port Trust for general revision of its Scale of Rates.(Notifying Revised Scale of Rates and Performance Standards.) |
(344 KB)
|
TAMP/10/2019-COPT | 10/10/2019 | 378 | 30/10/2019 |
| 58 | Proposal received from the Cochin Port Trust for general revision of its Scale of Rates. (Notifying Speaking Order) |
(1 MB)
|
TAMP/10/ 2019-COPT | 10/10/2019 | 446 | 04/12/2019 |
| 59 | Proposal received from Chennai Container Terminal Private Limited (CCTPL) for increasing the free days for Direct Port Entry (DPE) Export containers in its Scale of Rates. |
(168 KB)
|
TAMP/32/2019-CCTPL | 10/10/2019 | 373 | 30/10/2019 |
| 60 | Proposal received from Chennai International Terminal Private Limited (CITPL) for increasing the free days for Direct Port Entry (DPE) Export containers in its Scale of Rates. |
(167 KB)
|
TAMP/26/2019-CITPL | 10/10/2019 | 372 | 30/10/2019 |
| 61 | Proposal received from Chennai International Terminal Private Limited (CITPL) for General Revision of its Scale of Rates (SOR). |
(853 KB)
|
TAMP/36/2019-CITPL | 29/11/2019 | 486 | 23/12/2019 |
| 62 | Proposal received from Chennai Port Trust for general revision of its Scale of Rates.(Notifying Revised Scale of Rates and Performance Standards.) |
(584 KB)
|
TAMP/30/2019-CHPT | 10/10/2019 | 376 | 30/10/2019 |
| 63 | Proposal received for General Revision of Scale of Rates from Chennai Port Trust (CHPT).- Detailed speaking order. |
(1 MB)
|
TAMP/30/2019-CHPT | 10/10/2019 | 447 | 04/12/2019 |
| 64 | Extension of the validity of Revised Guidelines for Determination of Tariff for Projects at Major Ports, 2013 |
(72 KB)
|
TAMP/18/ 2013-Misc | 07/01/2019 | 16 | 16/01/2019 |
| 65 | Proposal from New Mangalore Port Trust (NMPT) for implementation of Berthing Policy for Dry Bulk Cargo for fixation of Anchorage charges and incentives and penalties. |
(659 KB)
|
TAMP/73/2018-NMPT | 10/10/2019 | 380 | 30/10/2019 |
| 66 | Proposal received from Paradip Port Trust (PPT) for fixation ofwharfage for Transhipment / Ship to Ship Transfer of LPG / LNG at PPT Anchorage and berth on common user basis. |
(154 KB)
|
TAMP/50/2019- PPT | 10/10/2019 | 385 | 30/10/2019 |
| 67 | Extension of validity of the Existing Scale of Rates of PPT. |
(81 KB)
|
TAMP/90/2016- PPT | 10/10/2019 | 384 | 30/10/2019 |
| 68 | Proposal received from Paradip Port Trust for revision of Scale ofRates for allotment of Port Land (expanded industrial zone) onlease basis for port related activities outside the custom bond area. |
(261 KB)
|
TAMP/43/2019- PPT | 29/11/2019 | 464 | 17/12/2019 |
| 69 | Proposal received from New Mangalore Port Trust (NMPT) for fixation of Reference Tariff for Mechanization of Berth No.14 for handling containers and other clean cargo on Design, Build, Finance, Operate and Transfer (DBFOT) basis at NMPT. |
(1 MB)
|
TAMP/69/2018-NMPT | 18/01/2019 | 78 | 26/02/2019 |
| 70 | Extension of the validity of Anchorage charges, Performance Standards for dry bulk cargo and incentives and penalties linked to Performance Standards of New Mangalore Port Trust (NMPT). |
(13 KB)
|
TAMP/97/2016-NMPT | 29/03/2019 | 195 | 07/06/2019 |
| 71 | The extension of the validity of the existing tariff for Harbour Mobile Crane (HMC) provided for handling General / Bulk Cargo at New Mangalore Port Trust (NMPT). |
(61 KB)
|
TAMP/24/2013-NMPT | 29/03/2019 | 197 | 07/06/2019 |
| 72 | Proposal received from the New Mangalore Port Trust seeking approval for Service Charges for the use of Electric Pump for supply of sea water. |
(125 KB)
|
TAMP/71/2018-NMPT | 29/03/2019 | 192 | 07/06/2019 |
| 73 | Proposal from the New Mangalore Port Trust for fixation of wharfage charges for shipment of Iron Ore fines from Jetty No.8 for the years 2017-18. |
(131 KB)
|
TAMP/16/2019-NMPT | 29/03/2019 | 194 | 07/06/2019 |
| 74 | Proposal from the New Mangalore Port Trust for general revision of its Scale of Rates – Notifying SOR and Performance Standards. |
(457 KB)
|
TAMP/78/2018-NMPT | 24/07/2019 | 294 | 21/08/2019 |
| 75 | Proposal from the New Mangalore Port Trust for general revision of its Scale of Rates – Notifying Speaking Order. |
(2 MB)
|
TAMP/78/2018-NMPT | 24/07/2019 | 307 | 03/09/2019 |
| 76 | Extension of the validity of Revised Guidelines for Determination of Tariff for Projects at Major Ports, 2013, for Regulation of Tariff. |
(287 KB)
|
TAMP/18/2013-Misc | 07/11/2019 | 419 | 25/11/2019 |
| 77 | Corrigendum to the Order No.TAMP/78/2018-NMPT dated 24 July 2019 notifying Scale of Rates on 21 August 2019 vide Gazette No.294 in the Gazette of India, disposing of the proposal received from the New Mangalore Port Trust (NMPT) for General Revision of its Scale of Rates. |
(110 KB)
|
TAMP/78/2018-NMPT | 29/11/2019 | 456 | 11/12/2019 |
| 78 | Proposal from the New Mangalore Port Trust for fixation of tariff for use of 63 tonne capacity Harbour Mobile Crane owned by the port for handling dry bulk, break bulk cargo and containers at New Mangalore Port. |
(309 KB)
|
TAMP/51/2019-NMPT | 29/11/2019 | 465 | 17/12/2019 |
| 79 | Proposal from the New Mangalore Port Trust for fixation of tariff for use of 100T Harbour Mobile Crane for handling all cargoes including containers by private service provider authorised by the port. |
(478 KB)
|
TAMP/41/2019-NMPT | 29/11/2019 | 466 | 17/12/2019 |
| 80 | Corrigendum to the Order No. TAMP/11/2018-ICTPL dated 31 July 2018 notified on 11 September 2018 vide Gazette No. 342 in the Gazette of India, disposing of the proposal received from Indira Container Terminal Private Limited (ICTPL) for fixation of adhoc tariff rates to be charged for RORO, Steel Cargo and Container Operations at its Offshore Container Terminal developed within the Mumbai Port Premises. |
(24 KB)
|
TAMP/11/ 2018-ICTPL | 18/01/2019 | 28 | 30/01/2019 |
| 81 | Extension of the validity of the existing adhoc scale of rates for RORO / Steel / Container Operations atOffshore Container terminal at Indira Container Terminal Private Limited (ICTPL). |
(79 KB)
|
TAMP/11/2018- ICTPL | 24/07/2019 | 293 | 21/08/2019 |
| 82 | Proposal received from Mumbai Port Trust seeking approval for rate of Special Way Leave Fees & rent payable by Oil and Natural Gas Corporation Limited (ONGC) to MBPT |
(480 KB)
|
TAMP/65/2018- MBPT | 18/01/2019 | 55 | 08/02/2019 |
| 83 | Proposal from the Mumbai Port Trust for general revision of its Scale of Rates – Notifying SOR and Performance Standards. |
(847 KB)
|
TAMP/5/2019-MBPT | 24/07/2019 | 308 | 03/09/2019 |
| 84 | Proposal received from Mumbai Port Trust for general revision of its Scale of Rates – Notifying Speaking Order. |
(689 KB)
|
TAMP/5/2019-MBPT | 24/07/2019 | 323 | 17/09/2019 |
| 85 | Corrigendum to the Order No. TAMP/5/2019-MBPT dated 24 July 2019 notified (only Scale of rates) on 03 September 2019 vide Gazette No. 308 in the Gazette of India, disposing of the proposal received from the Mumbai Port Trust (MBPT) for General Revision of its Scale of Rates |
(206 KB)
|
TAMP/05 / 2019- MBPT | 10/10/2019 | 366 | 24/10/2019 |