
| Sr. No. | Title | View | Order No. | Order Date | Gazette No. | Date of Notification |
|---|---|---|---|---|---|---|
| 1 | Proposal from Paradip Port Trust for general revision of its Scale of Rates. |
(87 KB)
|
TAMP/90/2016- PPT | 15/09/2021 | 442 | 08/10/2021 |
| 2 | Extension of validity of the existing Scale ofRates for stevedoring and shore handling operations at theParadip Port Trust. |
(37 KB)
|
TAMP/65/2016- PPT | 15/09/2021 | 443 | 08/10/2021 |
| 3 | Proposal received from Paradip Port Trust for revision of its Scale of Rates for allotment of Port Land and Built up premises outside the custom bounded area. |
(2 MB)
|
TAMP/07/2021- PPT | 16/03/2021 | 171 | 12/04/2021 |
| 4 | Proposal received from Paradip Port Trust for finalization of Scale of rates for leasing out of Port land outside theCustom Bond area in favour of Education Institutions. |
(219 KB)
|
TAMP/42/2019- PPT | 16/03/2021 | 159 | 12/04/2021 |
| 5 | Representation made by Kalinga International Coal Terminal Paradip Private Limited (KICTPPL) to review or rectify the errors in the Order No.TAMP/68/2016-PPTdated 2 January 2017 fixing reference tariff for development of new coal berth for handling of import coal atParadip Port Trust (PPT) on BOT basis. |
(570 KB)
|
TAMP/68/2016- PPT | 16/03/2021 | 169 | 12/04/2021 |
| 6 | Proposal received from Paradip Port Trust for fixation of tariff for Mechanized Handling of Thermal Coal by unloading at WagonTippler of Iron Ore Handling Plant andstacking at Stockyard of Mechanized Coal Handling Plant. |
(421 KB)
|
TAMP/20/2020- PPT | 16/03/2021 | 168 | 12/04/2021 |
| 7 | Proposal received from Paradip Port Trust for fixation of ContainerScanning tariff forloaded container. |
(617 KB)
|
TAMP/15/2021- PPT | 07/09/2021 | 418 | 28/09/2021 |
| 8 | Proposal received from Paradip Port Trust for revision of Performance Norm based Incentive/PenaltyScheme for Dry Bulk / Break Bulk and Project Cargo. |
(1 MB)
|
TAMP/49/2020- PPT | 16/03/2021 | 170 | 12/04/2021 |
| 9 | Proposal received from Paradip Port Trust for finalization of Scale of rates for leasing out of Port land outside theCustom Bond area in favour of Education Institutions. |
(428 KB)
|
TAMP/42/2019- PPT | 20/02/2020 | 96 | 03/03/2020 |
| 10 | Proposal received from Paradip Port Trust for extension of existingPerformance Norm based Incentive/PenaltyScheme for Dry Bulk / Break Bulk / Project Cargo with minor modification in the schemes. |
(438 KB)
|
TAMP/55/2019- PPT | 20/02/2020 | 108 | 11/03/2020 |
| 11 | Proposal received from Paradip Port Trust for extension of existingPerformance Norm based Incentive/PenaltyScheme for Dry Bulk / Break Bulk / Project Cargo of Paradip Port Trust. |
(10 KB)
|
TAMP/55/2019- PPT | 01/06/2020 | 221 | 18/06/2020 |
| 12 | Extension of validity of the existing Scale ofRates (SOR) for allotment of Port land and built up space outside the Custom Bond area for leasingand licensing purpose for non-port related activities for Paradip Port Trust (PPT). |
(28 KB)
|
TAMP/53/2014- PPT | 08/09/2020 | 376 | 24/09/2020 |
| 13 | Extension of validity of the existing Scale ofRates of Paradip Port Trust. |
(12 KB)
|
TAMP/90/2016- PPT | 08/09/2020 | 408 | 06/10/2020 |
| 14 | Representation made by Paradip East Quay Coal Terminal Private Limited (PEQCTL) to rectify the errors in Order no.TAMP/12/2014- PPTdated 21 February 2014 notified by TAMP fixing Reference Tariff for operation of Mechanised EQ berths no. 1, 2 and 3 atParadip Port Trust. |
(693 KB)
|
TAMP/12/2014- PPT | 28/10/2020 | 529 | 25/11/2020 |
| 15 | Proposal received from Paradip Port Trust for revision of Scale ofRates for allotment of Port Land (expanded industrial zone) onlease basis for port related activities outside the custom bond area. |
(261 KB)
|
TAMP/43/2019- PPT | 29/11/2019 | 464 | 17/12/2019 |
| 16 | Extension of validity of the Existing Scale of Rates of PPT. |
(81 KB)
|
TAMP/90/2016- PPT | 10/10/2019 | 384 | 30/10/2019 |
| 17 | Proposal received from Paradip Port Trust (PPT) for fixation ofwharfage for Transhipment / Ship to Ship Transfer of LPG / LNG at PPT Anchorage and berth on common user basis. |
(154 KB)
|
TAMP/50/2019- PPT | 10/10/2019 | 385 | 30/10/2019 |
| 18 | Proposal received from Paradip Port Trust for revision of tariff for 100 Ton capacity Harbour Mobile Crane (HMC). |
(706 KB)
|
TAMP/ 75/2018- PPT | 14/06/2019 | 248 | 11/07/2019 |
| 19 | Extension of the validity of the existing tariff for 100 Ton capacityHarbour Mobile Crane (HMC) installed by private operators atParadip Port Trust. |
(12 KB)
|
TAMP/30/2014- PPT | 25/02/2019 | 88 | 06/03/2019 |
| 20 | Extension of the validity of the existing tariff for 100 Ton capacityHarbour Mobile Crane (HMC) installed by private operators atParadip Port Trust. |
(71 KB)
|
TAMP/30/2014- PPT | 03/10/2018 | 390 | 18/10/2018 |
| 21 | Extension of the validity of the existing tariff for 100 Ton capacityHarbour Mobile Crane (HMC) installed by private operators atParadip Port Trust. |
(80 KB)
|
TAMP/30/2014- PPT | 19/03/2018 | 139 | 03/04/2018 |
| 22 | Proposal received from Paradip Port Trust for fixation of Ceiling Rate for Stevedoring andShore Handling Operation at PPT. |
(4 MB)
|
TAMP/65/2016- PPT | 19/03/2018 | 151 | 11/04/2018 |
| 23 | Proposal from Paradip Port Trust (PPT) for fixation of rate for handling Iron OrePellets / Iron Ore Fines/ Other Dry Bulk Cargo at the Mechanized Coal Handling Plant of PPT. |
(280 KB)
|
TAMP/23/2018- PPT | 31/07/2018 | 320 | 23/08/2018 |
| 24 | Proposal received from Paradip Port Trust for approving thePerformance norm based Incentive/Penalty in respect of handling Dry BulkCargo at Paradip Port Trust as per Berthing Policy 2016. |
(761 KB)
|
TAMP/79/2017- PPT | 03/10/2018 | 419 | 14/11/2018 |
| 25 | Proposal from Paradip Port Trust for general revision of its Scale of Rates. |
(872 KB)
|
TAMP/90/2016- PPT | 15/09/2017 | 422 | 01/11/2017 |
| 26 | Proposal received from Paradip Port Trust for revision of Scale ofRates for allotment of port land on lease basis for port related activities outside the custom bond area. |
(448 KB)
|
TAMP/36/2017- PPT | 21/07/2017 | 323 | 17/08/2017 |
| 27 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust. |
(10 KB)
|
TAMP/62/2009- PPT | 21/07/2017 | 319 | 17/08/2017 |
| 28 | Proposal received from Paradip Port Trust for revision of Scale ofRates of Port land. |
(380 KB)
|
TAMP/26/2016- PPT | 08/02/2017 | 104 | 21/03/2017 |
| 29 | Proposal from Paradip Port Trust forintroduction of Labour Cess for Iron OrePellets handled at Iron Ore Handling Plant (IOHP). |
(274 KB)
|
TAMP/55/2016- PPT | 08/02/2017 | 103 | 21/03/2017 |
| 30 | Proposal from Paradip Port Trust forintroduction of Labour Cess for the thermal coal handled at Iron Ore Handling Plant (IOHP). |
(212 KB)
|
TAMP/31/2016- PPT | 08/02/2017 | 92 | 06/03/2017 |
| 31 | Proposal received from Paradip Port Trust for development of NewCoal Berth for handling of Coal imports atParadip Port on BOT Basis. |
(384 KB)
|
TAMP/68/2016- PPT | 02/01/2017 | 61 | 21/02/2017 |
| 32 | Proposal received from the Paradip Port Trust (PPT) for fixation of upfront tariff forStevedoring and Shore Handling Operations at PPT. |
(141 KB)
|
TAMP/65/2016- PPT | 08/02/2017 | 65 | 21/02/2017 |
| 33 | Proposal from Paradip Port Trust forintroduction of Labour Cess for Iron OrePellets handled at Iron Ore Handling Plant |
(52 KB)
|
TAMP/55/2016- PPT | 04/01/2017 | 31 | 25/01/2017 |
| 34 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust. |
(177 KB)
|
TAMP/62/2009- PPT | 04/01/2017 | 20 | 18/01/2017 |
| 35 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust. |
(210 KB)
|
TAMP/62/2009- PPT | 06/05/2016 | 239 | 06/06/2016 |
| 36 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust. |
(172 KB)
|
TAMP/62/2009- PPT | 07/10/2016 | 392 | 28/10/2016 |
| 37 | Proposal received from Paradip Port Trust (PPT) for introduction of Labour Cess for the thermal coal handled at Iron Ore Handling Plant (IOHP). |
(80 KB)
|
TAMP/31/2016- PPT | 21/06/2016 | 275 | 04/07/2016 |
| 38 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust No.(TAMP/62/2009-PPT). |
(82 KB)
|
TAMP/62/2009- PPT | 10/11/2015 | 392 | 08/12/2015 |
| 39 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust No.(TAMP/62/2009-PPT).(Order Duplicate on website) |
(82 KB)
|
TAMP/62/2009- PPT | 10/11/2015 | 392 | 08/12/2015 |
| 40 | Proposal from theParadip Port Trust for fixation of Reference Tariff for Mechanization of CQ-1 and 2 Berths at the Paradip Port Trust (PPT) on BOT basis. (TAMP/44/2015-PPT). |
(521 KB)
|
TAMP/44/2015- PPT | 04/09/2015 | 335 | 29/09/2015 |
| 41 | Fixation of tariff for the use of Harbour Mobile Crane (HMCs) at the PPT, in compliance of the directions of theHon'ble High Court of Orissa.(No.TAMP/54/2007- PPT). |
(1 MB)
|
TAMP/54/2007- PPT | 02/07/2015 | 260 | 27/07/2015 |
| 42 | Proposal from the Paradip Port Trust(PPT) for revision of Scale of Rates for allotment of Port Land and built up space. (No.TAMP/53/2014-PPT). |
(608 KB)
|
TAMP/53/2014- PPT | 15/05/2015 | 224 | 17/06/2015 |
| 43 | Proposal received from the Paradip Port Trust (PPT) for fixation of cargo handling for use of transhipper assets provided by licensee at Paradeep PortAnchorage.(No.TAMP/46/2014- PPT). |
(126 KB)
|
TAMP/46/2014- PPT | 15/05/2015 | 208 | 04/06/2015 |
| 44 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust. No.(TAMP/62/2009-PPT). |
(81 KB)
|
TAMP/62/2009- PPT | 28/04/2015 | 147 | 05/05/2015 |
| 45 | Proposal received from the Paradip Port Trust (PPT) for general revision of its Scale of Rates. (TAMP/55/2012- PPT). |
(366 KB)
|
TAMP/55/2012- PPT | 13/02/2015 | 86 | 13/03/2015 |
| 46 | Extension of validity of the existing Scale ofRates of the Paradip Port Trust No.TAMP/62/2009-PPT). |
(77 KB)
|
TAMP/62/2009- PPT | 02/01/2015 | 47 | 10/02/2015 |
| 47 | Proposal from theParadip Port Trust for notification ofReference tariff for Mechanization of EQ - 1,2,3 berths at Paradip Port on BOT basis under Guidelines forDetermination of Tariff for Port Projects at Major Ports, 2013 No. (TAMP/12/2014-PPT) |
(69 KB)
|
TAMP/12/2014- PPT | 21/02/2014 | 138 | 19/05/2014 |
| 48 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust.No.TAMP/62/2009- PPT. |
(77 KB)
|
TAMP/62/2009- PPT | 10/01/2014 | 51 | 10/02/2014 |
| 49 | Proposal from theParadip Port Trust for fixation of Reference Tariff for development of multipurpose berth at PPT to handle containers of clean cargo. (TAMP/10/2014- PPT) |
(473 KB)
|
TAMP/10/2014- PPT | 19/02/2014 | 78 | 04/03/2014 |
| 50 | Extension of the validity of the existing Scale of Rate of the ParadipPort Trust No.(TAMP/62/2009-PPT) |
(76 KB)
|
TAMP/62/2009- PPT | 04/04/2014 | 143 | 19/05/2014 |
| 51 | Addendum to OrderNo. No.TAMP/10/2014- PPT dated 19.02.2014relating to a Proposal received form Paradip Port Trust (PPT) for fixation of Reference tariff for development of Multipurpose Berth atPPT to handleContainers and clean cargo No.(TAMP/10/2014-PPT) |
(85 KB)
|
TAMP/10/2014- PPT | 19/03/2014 | 139 | 19/05/2014 |
| 52 | Extension of the validity of the existing Scale of Rates of the ParadipPort Trust. |
(77 KB)
|
TAMP/62/2009- PPT | 04/07/2014 | 205 | 15/07/2014 |
| 53 | Policy directions issued by the Ministry ofShipping under Section 111 of Major Port Trusts Act, 1963 for prescription of Royalty to be received byParadip Port Trust (PPT) as envisaged in the Standard Operating Procedure (SOP) for transloading operations in the area notified under the limits of PPT. (No.TAMP/33/2014-Genl). |
(284 KB)
|
TAMP/33/2014-Genl | 17/07/2014 | 226 | 25/07/2014 |
| 54 | Extension of validity of the existing Scale ofRates of the Paradip Port Trust.No.TAMP/62/2009- PPT. |
(78 KB)
|
TAMP/62/2009- PPT | 30/09/2014 | 307 | 03/11/2014 |
| 55 | Proposal from the Paradip Port Trust (PPT) for fixation of tariff for he use ofHarbour Mobile Crane (HMC) No.(TAMP/30/2014-PPT). |
(657 KB)
|
TAMP/30/2014- PPT | 28/11/2014 | 7 | 05/01/2015 |
| 56 | Proposal from theParadip Port Trust for fixation of Reference Tariff for Mechanization of CQ-1 and 2 Berths at the Paradip Port Trust (PPT) on BOT basis. (TAMP/44/2015-PPT). |
(299 KB)
|
TAMP/12/2014- PPT | 21/02/2014 | 335 | 29/09/2014 |
| 57 | Proposal received from the Paradip Port Trust for re-fixation ofReference tariff for a new iron ore berth to be developed for handling of iron ore exports atParadip Port on BOT basis, under the Guidelines forDetermination of Tariff for Port Projects at Major Ports, 2013.No.TAMP/28/2014- PPT. |
(656 KB)
|
TAMP/28/2014- PPT | 05/06/2014 | 182 | 17/06/2014 |
| 58 | Addendum to OrderNo.TAMP/38/2013-PPTdated 30 August 2013 relating to proposal from the Paradip Port Trust for notification of Reference tariff for development of Multipurpose berth of 5 MTPA for handling clean cargo including containers on BOT basis, under the Guidelines for determination of Tariff for Port Projects at Major Port, 2013 (No.TAMP/38/2013-PPT). |
(73 KB)
|
TAMP/38/2013- PPT | 05/12/2013 | 334 | 26/12/2013 |
| 59 | Addendum to OrderNo.TAMP/37/2013-PPTdated 30 August 2013 relating to proposal from the Paradip Port Trust for notification of Reference tariff for development of Deep Draught Iron Ore berth of 10 MTPA Capacity on BOT basis, in pursuance of the Guidelines for determination of Tariff for Projects at MajorPort, 2013(No.TAMP/37/2013- PPT). |
(73 KB)
|
TAMP/37/2013- PPT | 05/12/2013 | 333 | 26/12/2013 |
| 60 | Proposal from theParadip Port Trust for fixation of reference tariff for development of Multipurpose berth of 5 MTPA for handling clean cargo including containers on BOT basis under the Guidelines forDetermination of Tariff for Projects at Major Ports, 2013.(TAMP/38/2013-PPT)(Reference Tariff) |
(1 MB)
|
TAMP/38/2013- PPT | 30/08/2013 | 246 | 20/09/2013 |
| 61 | Proposal from theParadip Port Trust for development of Deep Draught Iron Ore berth of 10 MTPA capacity on BOT basis under the Guidelines forDetermination of Tariff for Projects at Major Ports,2013(TAMP/37/2013-PPT) (Reference Tariff) |
(305 KB)
|
TAMP/37/2013- PPT | 30/08/2013 | 245 | 20/09/2013 |
| 62 | Proposal from theParadip Port Trust for general revision ofScale of Rates |
(581 KB)
|
TAMP/62/2009- PPT | 25/03/2011 | 111 | 23/05/2011 |
| 63 | Clarification sought by the Paradip Port Trust for applicability of wharfage charges for handling Iron Ore Pellets at Central Quay-III berth after conversion into a Mechanised Berth |
(77 KB)
|
TAMP/9/2011-PPT | 18/02/2011 | 43 | 01/03/2011 |
| 64 | Proposal of Paradeep Port Trust for revision of tariff for cargo handling by Paradeep Phosphates Limited at Fertilizer Berth No.1.q |
(386 KB)
|
TAMP/36/2011- PPT | 22/11/2011 | 238 | 07/12/2011 |
| 65 | Proposal from the Paradip Port Trust for revision of Tariff for cargo handling by Paradeep Phosphates Limited at Fertilizer Berth No.1 |
(204 KB)
|
TAMP/28A/2009-PPT | 29/11/2010 | 12 | 22/01/2011 |
| 66 | Review of the Order no. TAMP/43/2009-PPT dated 19.01.2010 passed by the Authority in the case relating to the proposal filed by the Paradip Port Trust for fixation of upfront tariff for multipurpose berth to handle clean cargo including containers. |
(51 KB)
|
TAMP/43/2009-PPT | 31/03/2010 | 139 | 30/04/2010 |
| 67 | Extention of the validity of the existing Scale of Rates of the Paradip Port Trust |
(5 KB)
|
TAMP/60/2005 – PPT | 31/03/2010 | 129 | 28/04/2010 |
| 68 | Proposal from Paradip Port Trust for fixing upfront tariff for development of multipurpose berth to handle clean cargo including containers on BOT Basis at Paradip Port |
(211 KB)
|
TAMP/43/2009-PPT | 19/01/2010 | 51 | 16/02/2010 |
| 69 | Proposal from the Paradip Port Trust for fixation of tariff for the use of Harbour Mobile Cranes |
(292 KB)
|
TAMP/54/2007-PPT | 30/12/2009 | 21 | 12/01/2010 |
| 70 | Proposal from Paradip Port Trust for revision of captive berth hire charges levied on Indian Fertiliser Co-operative Limited (IFFCO) for fertiliser berth No. 2 |
(7 KB)
|
TAMP/18/2009 –PPT | 28/07/2009 | 159 | 25/08/2009 |
| 71 | De-notification of the Railway charges earlier notified by this Authority in the Scale of Rates of Paradip Port Trust. |
(8 KB)
|
TAMP/60/2005 –PPT | 27/03/2009 | 62 | 13/04/2009 |
| 72 | Proposal from the Paradip Port Trust for upfront tariff setting for construction of (i) a deep draught iron ore and (ii) a deep draught coal Berth on BOT basis |
(268 KB)
|
TAMP/18/2008-PPT | 14/07/2008 | 133 | 16/08/2008 |
| 73 | Reintroduction of the penal berth hire charges in the Scale of Rates of Paradip Port Trust |
(70 KB)
|
TAMP/60/2005-PPT | 22/04/2008 | 103 | 21/06/2008 |