
| Sr. No. | Title | View | Order No. | Order Date | Gazette No. | Date of Notification |
|---|---|---|---|---|---|---|
| 1 | Proposal received from the South West Port Limited (SWPL) for revision of its Scale of Rates for Berth 5A and 6A in the Mormugao Port Trust under the Tariff Guidelines 2019. |
(1 MB)
|
TAMP/38/2019- SWPL | 29/11/2019 | 499 | 30/12/2019 |
| 2 | Proposal received from South West Port Limited (SWPL) for revision of its Scale of Rates for Berth 5A and 6A in the Mormugao Port Trust. |
(967 KB)
|
TAMP-40- 2016-SWPL | 17/11/2016 | 10 | 06/01/2017 |
| 3 | Proposal received from South West Port Limited(SWPL) for revision of its Scale ofRates for Berth 5A and 6A in the Mormugao Port Trust |
(533 KB)
|
TAMP/40/2016- SWPL | 17/11/2016 | 433 | 30/11/2016 |
| 4 | Extension of the validity of the existing Scale of Rates of South West Port Limited. |
(148 KB)
|
TAMP/19/2013- SWPL | 21/06/2016 | 276 | 04/07/2016 |
| 5 | Review application filed by the South West Port Limited (SWPL) on the Order No.TAMP/19/2013-SWPL passed by the Authority on 2 January 2015 in respect of revision of the Scale of Rates for its operations at the multipurpose cargoterminal at berth nos. 5A and 6A in the Mormugao Port Trust.(No.TAMP/24/2015- SWPL). |
(752 KB)
|
TAMP/24/2015- SWPL | 15/01/2016 | 82 | 04/03/2016 |
| 6 | Corrigendum to Order No. TAMP/12/2010- SWPL dated 30.09.2014 relating to an extension of the validity of the existing Scale of Rates of South West Port Limited. |
(121 KB)
|
TAMP/12/2010- SWPL | 15/05/2015 | `191 | 27/05/2015 |
| 7 | Proposal received from the South West Port Limited (SWPL) for revision of its Scale of Rates for its operations at the multipurpose cargo terminal at berth 5A and 6A in the Mormugao Port Trust MOPT(TAMP/19/2013-SWPL). |
(1 MB)
|
TAMP/19/2013- SWPL | 02/01/2015 | 51 | 10/02/2015 |
| 8 | Extension of validity of the existing Scale of Rates of the South West Port Limited for the multipurpose bulk cargo terminal at berth nos.5A and 6A in the Mormugao Port Trust. No.TAMP/12/2010-SWPL. |
(14 KB)
|
TAMP/12/2010- SWPL | 30/09/2014 | 309 | 03/11/2014 |
| 9 | Extension of the validity of the existing Scale of Rates of South West Port Limited. |
(11 KB)
|
TAMP/12/2010- SWPL | 04/07/2014 | 208 | 15/07/2014 |
| 10 | Extension of the validity of the existing Scale of Rate of the South West Port Limited for the multipurpose bulk cargo terminal at berth nos. 5A and 6A in the Mormugao Port Trust. No.(TAMP/12/2010-SWPL) |
(11 KB)
|
TAMP/12/2010- SWPL | 04/04/2014 | 150 | 19/05/2014 |